Monday, October 1, 2007

Program Outline

Program Outline

Location / address:

Client: Sumitomo Mitsui Banking Corporation Building design intent: (ex. To attract and accommodate leading domestic and international shipping corporations. The building plan / layout will allow the maximum flexibility within each floor. Environmental Issues: (ex. -Building efficiency- natural daylight and high efficiency HVAC systems. -Water Conservation- gray water treatment and rainwater collection treatment. -Green Energy Production- photovoltaic cells and urban ecology to maximize green space.

Conference Center: (# of floors and total sq. ft.)

Restaurants: (location and total sq. ft.)

Cafes: (location and total sq. ft.)

Lobby/Mezzanine:(location and total sq. ft.)

Retail Space: (# of floors and total sq. ft.)

Atrium Lower: (# of floors/partial and total sq. ft.)

Atrium Upper: (# of floors/partial and total sq. ft.)

Vertical Circulation: Elevator Core Escalators (lower levels only)

Office: Boutique Office (# of floors and total sq. ft.) Standard Office (# of floors and total sq. ft) Residential:Luxury Residences (# of floors and total sq. ft) Standard Residences (# of floors and total sq. ft)

Hotel:(# of floors and total sq. ft)

Parking: (# of floors and total sq. ft)

Mechanical: HVAC, Plumbing/fire protection, Trash, etc.

Observation Deck: (total sq. ft)

Sky Lobby and Spa: (# of floors and total sq. ft)

Total Tower Ht.= Total Sq. Ft=

Description of Site plan and groundscaping.

No comments: